Fixing the Outdoor Unit in Place
Final Checks and Trial Operation
To complete the installation, perform the following checks and tests to ensure
that the air conditioner operates correctly.
1 Check the following.
◆ Strength of the installation site
◆ Tightness of pipe connection to detect a gas leak
◆ Electric wiring connection
◆ Heat-resistant insulation of the pipe
◆ Drainage
◆ Earth conductor connection
◆ Correct operation (follow the steps below)
2 Press the button for 5 seconds. Or press the K1 switch of the display board
twice(Cooling test operation) or 3 times(Heating test operation) after removing the side
cover of the outdoor unit.
◆ The LED of the indoor unit displays the option code.
◆ The airflow blade swings up and down and the indoor fan operates.
Rubber leg
1 Place the outdoor unit as indicated on the top of the unit to let the discharged air out
properly.
2 Fix the outdoor unit to the appropriate support using anchor bolts.
3 If the outdoor unit is exposed to strong winds, install shield plates around
the outdoor unit, so that the fan can operate correctly.
You should install the outdoor unit on a stable base to avoid the generation of
noise and vibration, especially when installing the outdoor unit close to your
neighbor.
If you install the outdoor unit in a place exposed to strong winds or at a height,
you must fix it to the appropriate support (wall or ground).
➢ Secure the rubber leg in order to prevent the generation of noise and
vibration.
Unit : inch(mm)
Completing the Installation