Samsung AVXTJ series Przewodnik Instalacji Strona 42

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 137
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 41
2. Preparation for installation
42
Problem analysis
After purchasing the pipe, it was not kept properly so
dust, foreign substances, water and industrial water got
inside of the pipe. Also pipe was left on the ground and
people just walked on them.
Consequence
Water or foreign substances within the pipe will cause
blockage that can lead to product malfunction or
performance decrease.
Standard procedure
When storing the pipe, use cover or tape to block the
entrance and do not leave them on the ground but keep
them on the supporting structure with at least 30mm in
height.
Proper method
Strictly follow the standards.
Przeglądanie stron 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 136 137

Komentarze do niniejszej Instrukcji

Brak uwag