E-18
To complete the installation, perform the following checks and tests to
ensure that the air conditioner is operating correctly.
Step 1 Review all the following elements in the installation:
◆ Installation site strength
◆ Piping connection tightness to detect any gas leakages
◆ Connection wiring
◆ Heat-resistant insulation of the piping
◆ Drainage
◆ Earthing wire connection
Step 2 ◆ Check the room select switch in the indoor unit:
Move the room select switch downward in the A unit and move
the switch upward in the B unit.
◆ Set an indoor unit connected to upper service valves to the A unit, then
set the other indoor unit connected to lower service valves to the B
unit. The liquid and gas refrigerant pipes should not be crossed with
each other.
Step 3 Apply the power to the outdoor unit.
C
OMPLETING THE
I
NSTALLATION
Checking and Testing Operations
OUTDOOR UNIT
A unit
B unit
B unit
A unit
INDOOR UNIT
Room select
switch
Komentarze do niniejszej Instrukcji