E-5
ENGLISH
PREPARING THE INSTALLATION
◗ Piping length and the height
◗ Chargeless
Demension
Composition
1 Room max
length
20 m
(A) or (B)
2 Room total max
length
30 m
(A) + (B)
Max height between
indoor unit & outdoor unit
7 m
(C)
Max height between
indoor unit A & B
3 m
(D)
2 Room total max length
Within 30m
(A) + (B)
1 Room max length
Within 20m
(A) or (B)
160 mm
or more
20 mm
or more
◗ 14,000Btu/h
100 mm
or more
300 mm
minimum
600 mm
minimum
600 mm
minimum
300 mm
minimum
A-unit
7,000(2.05kW) or
9,000 Btu/h(2.63kW)
B-unit
9,000(2.63kW) or
12,000Btu/h(3.51kW)
Circuit breaker
(20A)
Main power switch
(B)
(D)
(C)
(A)
1,220-240~,50
Indoor unit Outdoor unit
Power supply
Ø, V, Hz
MH14VA1(A2)(C1)(C2)
MH14VA1(A2)(C1)(C2)X
◗ 14,000Btu/h 18,000Btu/h
Unit
Pipe size
Liquid
A-
Unit
1/4”
Gas
3/8”
B-
Unit
1/4” 3/8”
◗ 18,000Btu/h
1,220-240~,50
Indoor unit Outdoor unit
Power supply
Ø, V, Hz
MH18VA1(A2)(C1)(C2)
MH18VA1(A2)(C1)(C2)X
◗ 19,000Btu/h
1,220-240~,50
Indoor unit Outdoor unit
Power supply
Ø, V, Hz
MH19VA1(A2)(C1)(C2)
MH19VA1(A2)(C1)(C2)X
❋ The designs of the unit and the connection valve are subject to change according to the model.
◗ 19,000Btu/h
Unit
Pipe size
Liquid
A-
Unit
1/4”
Gas
3/8”
B-
Unit
1/4” 1/2”
Komentarze do niniejszej Instrukcji